References

Total posts: 19

Heat shrink joint type KBT3x95/6 and KBT3x120/35 for submarine cable

Posted on: 30 December 2018 - 13:48 | View: 3769

Heat shrink joint type KBT3x95/6 and KBT3x120/35 for submarine power cable is designed to connect cable for a voltage of 6 (10)kV and 35kV.Heat shrink joint is designed to work at a depth of 200 ...

read more >>>

Purchase, delivery and installation of sheet-cutting equipment brand BODA-5000

Posted on: 30 December 2018 - 13:37 | View: 4931

Purchase, delivery and installation of sheet-cutting equipment brand BODA-5000. The length of the equipment is 25 meters. Width - 5 meters. Sheet cutting thickness 6-100 mm. commissioned by SOCAR. ...

read more >>>

Purchase and delivery of a special submarine cable with XLPE insulation

Posted on: 30 December 2018 - 13:32 | View: 3951

Purchase and delivery of a special submarine cable with XLPE insulation to an individual SOCAR order. The length is 20,000 meters. Customer Oil and Gas Construction Trust "SOCAR". 2016 ...

read more >>>

Purchase and delivery of 8 000 meters of SAWL pipes

Posted on: 25 April 2014 - 16:52 | View: 3041

Purchase and delivery of 8 000 meters of SAWL pipes with 3 (LPE) insulation,diameter 1020 x 16 mm for the needs of «SOCAR». Purchase was made in China, at the “HEBEI STEEL PIPE ...

read more >>>

Purchase and delivery of V-belts for the needs of the oil industry

Posted on: 11 March 2014 - 12:43 | View: 2727

Purchase and delivery of V-belts for the needs of the oil industry. The purchase order was placed at "UZEMIK" (Russia) and "TehnoBelt." (China) The total value of the contract - 320,000 USD. The ...

read more >>>

Purchase and delivery of spare parts for drill pumps and universal preventers

Posted on: 11 March 2014 - 12:42 | View: 2934

Purchase and delivery of spare parts for mud pumps and universal preventers of HHF-1600 \ F-1600HL types. Whole range of equipment and facilities were acquired from the People's Republic of ...

read more >>>

Design and delivery of special order of "SOCAR" and Baku Shipyard

Posted on: 11 March 2014 - 12:41 | View: 1882

Delivery of Exclusively Designed and produced manifolds for the urgent needs of "SOCAR" and Baku Shipyard over the production of 180 manifolding sets of 4 specific modifications. The order was ...

read more >>>

Purchase, installation, setup and activation of rolling-and-bending and sheet cutting machines

Posted on: 11 March 2014 - 12:39 | View: 1571

Purchase, installation, setup and activation of rolling-and-bending and sheet cutting machines of "TRUMP" company, Germany. The brands of machines are Tru Lazer and Tru Bend. The contract value - ...

read more >>>

Purchase and delivery of 11 000 thousand meters of well pipe with locks

Posted on: 11 March 2014 - 12:37 | View: 1545

Purchase and delivery of 11 000 thousand meters of well pipe with locks for the needs of «SOCAR». Purchase was made in the U.S.A, at the "JINDAL SAW USA, LLC" company, Texas. The ...

read more >>>

Purchase and delivery of 1000 tons of reinforcement for the needs of "SOCAR"

Posted on: 11 March 2014 - 12:36 | View: 1494

Purchase and delivery of 1000 tons of reinforcement for the needs of «SOCAR». The range of reinforcement sizes is 8-24 mm. The mentioned products were purchased in "Magnitogorsk ...

read more >>>

Purchase and supply of 6 sets of drill pump of NB-125 type

Posted on: 11 March 2014 - 12:35 | View: 1740

Purchase and supply of 6 sets of drill pump of NB-125 type in Russia for the needs of "AZNEFT." The contract value - 300,000 USD. The drilling is up to 1500 meters. The customer - PA "Azneft" of ...

read more >>>

Purchase and supply of spare parts for drill pumps

Posted on: 11 March 2014 - 12:33 | View: 1830

Purchase and supply of spare parts for Russian drill pumps of NB-32 , 9 -MGR (НБ-125) types, as well as the UNB -600 (УНБ-600) (Izhneftmash, Uralburservis, Sibtreydgrupp). This product is available ...

read more >>>

Purchase, installation, setup and activation of pile-driving equipment

Posted on: 11 March 2014 - 12:31 | View: 1690

Purchase, installation, setup and activation of pile-driving equipment. The equipment was purchased in Holland in the "Dieseco" company. This equipment has been used for piling on the sea. The ...

read more >>>

Purchase, installation, setup and activation of crane runways

Posted on: 11 March 2014 - 12:30 | View: 1826

Purchase, installation, setup and activation of crane runways of 22,000 meters for Baku Shipyard. This work is carried out in close cooperation with the "Gantrex" company (Germany) and Arcelor ...

read more >>>

Purchase of pipes and fittings of stainless steel

Posted on: 11 March 2014 - 12:28 | View: 1799

Purchase of pipes and fittings of stainless steel of the "Sentravis" company (Ukraine) and "Buhlmann" (Germany) for Baku Shipyard. The production will be used for creation of a fire-extinguishing ...

read more >>>

Form of address for participation in the tender

Company/Firm *

Country *

Sender's name *

E-mail *

(*) - Mandatory field to be filled in